Description
1. Objective:
Analyze the productive utilization of equipment and personnel, as well as the degree of implementation of lean manufacturing tools, through interviews with key personnel, measurement of operation cycle times, workload balancing criteria, standard staffing, and process mapping.
2. Methodology:

General diagnosis

General work plan

Kaizen plan by area

Implementation of improvements

Standardization of operations

Results and continuous improvement
3. Deliverables:
At the end of the diagnostic stage, a report will be shared containing the areas of opportunity detected during the visit, as well as a scenario of expected impacts on the production and/or administrative lines. Additionally, this information will make it possible to provide a detailed proposal of times and costs for the client.
4. Benefits:
✅ Reduction of non-value-added activities
✅ Elimination of delays and waste
✅ Increase in operational efficiency
✅ Reduction of inventory levels



Reviews
There are no reviews yet.