Video: The New Control Plan Manual: What Changed?

The New Control Plan Manual: What Changed?

This video explains what changed in the new Control Plan Manual (AIAG & VDA 2024) and how expectations have evolved beyond just the format.

It covers the stronger alignment with PFMEA, the need for clear and executable reaction plans, the introduction of Safe Launch Control Plans, and more detailed requirements for control methods.

Frequently asked questions about the new Control Plan manual

What is the new Control Plan manual?

The new Control Plan manual is the updated guideline published by AIAG (aligned with VDA) that defines how Control Plans should be developed, maintained, and used to manage process and product quality. It places stronger emphasis on risk-based thinking and alignment with PFMEA.

What changed in the new Control Plan manual?

Key changes include:

    • Stronger alignment with the AIAG & VDA PFMEA structure
    • Clearer linkage between risks, controls, and process steps
    • More detailed expectations for monitoring and reaction plans
    • Increased focus on maintaining the Control Plan as a living document

Is the Control Plan still part of APQP?

The Control Plan is still used within the APQP process, but it is now a standalone manual.

This separation provides clearer guidance and emphasizes its importance throughout the product lifecycle.

Why is the new Control Plan manual important?

It improves how organizations control risks and ensure process stability. By strengthening the connection between FMEA and shop floor controls, it helps reduce defects, improve consistency, and meet customer and IATF 16949 requirements.

Training & Resources