Description
PPAP – Production Part Approval Process (4th Edition)
Introduction
• Importance of PPAP
• Relation to IATF 16949:2016
• When a PPAP is required?
• Who is responsible for PPAP?
18 PPAP Requirements
• Significant production run
• Design records
+ IMDS – International Material Data System
+ Marking of polymeric parts
• Authorized engineering change documents
• Customer engineering approval
• Design FMEA
• Process flow diagram
• Process FMEA
• Control Plan
• MSA – Measurement System Analysis
• Dimensional results
• Records of material / performance test results
• Initial process studies (Cp, Cpk, Pp, Ppk)
• Qualified laboratory documentation
• Appearance Approval Report (AAR)
• Sample production parts
• Master sample
• Checking aids
• CSR – Customer Specific Requirements
• PSW – Part Submission Warrant
Customer notification
PPAP submission levels
PPAP disposition
Record retention



Furukawa –
Excellent session. The instructor was well-prepared and always attentive to questions.
Albaform MX –
Great course—all my questions were answered clearly!
Furukawa Automotive –
Expectations were met, and all questions were clarified.