Description
1. Objective:
Interpret, standardize, and harmonize the bases and criteria that support the Lean Manufacturing concept under process methodologies, time, and motion measurements.
2. Methodology:
Calculation of average time
Calculation of tolerances
Calculation of standard time leveling factor
Toyota method for time studies
Predetermined MOST methodology
3. Deliverables:
- Time and motion study
- Workload leveling and efficiency
- Layout and cellular manufacturing proposal
4. Benefits:
✅ Establish proper flow, level workloads, set clear productivity goals considering real and balanced cycle times, and reduce waste within the production system
Comentarios



Reviews
There are no reviews yet.